22 MWp, Kadapa, Andhra Pradesh

Solar Power Plant 22 MWp

  • Area of the plant

    88 acre

  • Duration

    4 months

  • Homes powered

    1,467

  • Number of people
    who worked on the
    project

    60

  • Number of panels

    77,846

  • Scope of work

    EPC with PS and switch yard

  • Business Vertical

    Utility Scale