Duration
4 months
Scope of Work
Turnkey EPC
Key Highlights
Deployed a three-legged module, mounting the structure with a combination of concrete ballast and pilling foundations to make the project site flood resistant
Conducted a detailed flood analysis and installed outdoor inverter stations with RCC beams to tackle the soft, mushy soil